Pre-Qualification - earth and underground engineering

Berlin, 04.05.2007 - valid until 05/2009

General engineering works, construction services for supply channels and cables

Pre-Qualification - underground cable engineering

Berlin, 18.02.2008 - valid until 30.09.2009

Underground cable engineering (Level 5 -> works contracts 1.000.000,00 EUR)
and construction work for power lines (Level 3 -> works contracts 250.000,00 EUR)

Pre-Qualification - Railway (ballast track superstructure)

Berlin, 09.03.2007 - valid until 03/2009

Track superstructure product area – track category (ballast track superstructure)
for the type I greatest admissible speed range

Pre-Qualification - Points (ballast track superstructure)

Berlin, 09.03.2007 - valid until 03/2009

Track superstructure product area – points category (ballast track superstructure)
for the type I - S - Bahn greatest admissible speed range